Pipelines
Chinook has completed pipeline projects from NPS 2 to NPS 24, 150 ANSI to 900 ANSI, and 0-30% H2S. Chinook’s scope frequently includes tasks such as:
- Route Selection,
- Regulatory Applications (OGC, NEB, ERCB),
- Dispersion Modeling,
- Pipeline Hydraulics,
- Liquid Slug sizing,
- Stress Analysis,
- Material Specification,
- Directional drilling,
- Aerial crossings,
- ESD stations, and
- Pigging stations.